Projects

Project Lists

We create the future through challenge and innovation.

No. PROJECT TITLE WORK CLIENT PERIOD
01 Zinus III Tank Facilities Project Storage Tank & Related Facilities Setting PT. Zinus Dream Indonesia 15-April-2022 15-September-2022
02 EP Compound Project Civil & RC Work Lotte E&C 01-April-2020 31-December-2021
03 Yongjin Factory Project Electrical & Mechanical Work PT. Yongjin Javasuka Garment December-2014 May-2015
04 Yongjin Factory Project Domitory Renovation Work PT. Yongjin Javasuka Garment October-2014 February-2015
05 Yongjin Factory Project Additional Canopy Work PT. Yongjin Javasuka Garment October-2014 May-2015
06 Hankook Tire Indonesia Plant Ph.2 Project Civil Work Lotte E&C August-2014 May-2015
07 Yongjin Factory Project Civil & Building Work PT. Yongjin Javasuka Garment June-2014 June-2015
08 Krakatau-Posco Steel Mill Plant Project Reinforcing Mechanical Work At Blast Furnace Area PT. Posco E&C Indonesia April-2014 June-2015
09 Toray Factory Project Additional Civil & Architecture Construction Works II PT. Toray Polytech Jakarta October-2012 November-2012
10 Toray Factory Project Piping Work, Power System Work PT. Toray Polytech Jakarta September-2012 January-2013
11 Toray Factory Project Additional Civil & Architecture Construction Works PT. Toray Polytech Jakarta August-2012 November-2012
12 Toray Factory Project Installation for Panel & Cable PT. Toray Polytech Jakarta July-2012 August-2012
13 Toray Factory Project Fab. & Installation for Silo Template & Anchor Bolt PT. Toray Polytech Jakarta July-2012 August-2012
14 Toray Factory Project Power Cable & Cable Tray Supply PT. Toray Polytech Jakarta March-2012 June-2012
15 Toray Factory Project Electric Panel Supply PT. Toray Polytech Jakarta March-2012 June-2012
16 Krakatau-Posco Steel Mill Plant Project Steel Structure Erection Work At Plate Mill Area PT. Posco E&C Indonesia February-2012 December-2012
17 Toray Factory Project Mechanical, Electrical & Hydrant Work PT. Toray Polytech Jakarta December-2011 July-2012
18 Krakatau-Posco Steel Mill Plant Project Site office Building Construction Work PT. Posco E&C Indonesia February-2011 June-2011
19 KG Technology Project Additional Installation Work of Forging, Foundry, Mech. PT. KG Technology November-2007 December-2007
20 Maintenance Project Maintenance Work PT. LG EDDI November-2007 November-2007
21 Maintenance Project Maintenance Work PT. LG Philips Indonesia November-2007 November-2007
22 Factory Construction Project Renovation Work PT. Dada Indonesia July-2007 August-2007
23 Wind Tower Factory Project Additional Work PT. Korindo Heavy Industry June-2007 June-2007
24 KG Technology Project Installation Work of Foundry Furnace PT. KG Technology May-2007 July-2007
25 Factory Construction Project Additional Garment Factory Work PT. Dada Indonesia May-2007 July-2007
26 KG Technology Project Installation Work of Die Casting Equipment PT. KG Technology March-2007 August-2007
27 KG Technology Project Installation Work of Fabricate Equipment PT. KG Technology March-2007 August-2007
28 KG Technology Project Installation Work of Cating Equipment PT. KG Technology March-2007 August-2007
29 PT. Dua Kuda Indonesia Project Civil Work PT. Dua Kuda Indonesia January-2007 February-2007
30 Wind Tower Factory Project Supply Lighting Material PT. Kostra Mas Jaya November-2006 November-2006
31 Factory Construction Project Electrical & Mechanical Work PT. Dada Indonesia November-2006 April-2007
32 Maintenance Project Maintenance Project PT. LG EDDI October-2006 October-2006
33 Maintenance Project Maintenance Project PT. LG Philips Indonesia October-2006 October-2006
34 Wind Tower Factory Project Utility Piping Work PT. Kostra Mas Jaya October-2006 November-2006
35 Factory Construction Project Electrical Work PT. Bu Kyung Indonesia October-2006 November-2006
36 Factory Construction Project High Voltage Electrical Work PT. Bu Kyung Indonesia August-2006 October-2006
37 Wind Tower Factory Project Supply Belt Conveyor PT. Kostra Mas Jaya July-2006 July-2006
38 Wind Tower Factory Project Fab. & Installation for Shot Blast Sub-Equipment Work PT. Kostra Mas Jaya July-2006 August-2006
39 Wind Tower Factory Project Electrical Work PT. Kostra Mas Jaya July-2006 September-2006
40 Factory Construction Project Additional Garment & Other Work PT. Dada Indonesia May-2006 June-2006
41 Factory Construction Project Installation Water Filter PT. Dada Indonesia March-2006 April-2006
42 Factory Construction Project Garment Factory Work PT. Dada Indonesia March-2006 May-2006
43 Factory Construction Project Renovation II Work To PT. Dada Factory PT. Dada Indonesia November-2005 December-2005
44 Maintenance Project Maintenance Work PT. LG EDDI October-2005 October-2005
45 Maintenance Project Maintenance Project PT. LG Philips Indonesia October-2005 October-2005
46 Factory Construction Project Renovation Work To Toy & Cap Factory PT. Dada Indonesia September-2005 October-2005
47 Factory Construction Project Additional Work To Printing Factory PT. Dada Indonesia September-2005 October-2005
48 Factory Construction Project Printing Factory PT. Dada Indonesia July-2005 October-2005
49 Maintenance Project Maintenance Factory (II) PT. Dada Indonesia June-2005 July-2005
50 Maintenance Project Maintenance Factory (I) PT. Dada Indonesia May-2005 June-2005
51 Maintenance Project Boiler Setting and Unloading Work PT. Dongjin Indonesia February-2005 February-2005
52 Factory Construction Project Renovation Fence and Other Work PT. Dada Indonesia September-2003 September-2003
53 Factory Construction Project Renovation Factory PT. Dada Indonesia July-2003 August-2003
54 Waste Incinerator Plant Project Fab. & Erection of Gas Duct PT. Fajar Surya Wisesa Tbk. December-2014 December-2014
55 Maintenance Project Feed Water Storage Tank Removal & Installation Work PT. Aspex Kumbong July-2014 July-2014
56 Aspex Kumbong Sludge Incinerator Plant Project PM2 Press Part Frame Lining & PM3 Drum Pulperizer Screen Zone Work PT. Aspex Kumbong August-2012 August-2012
57 Aspex Kumbong Sludge Incinerator Plant Project Install Lining SUS Plate for Calender Pit & Press Pit PT. Aspex Kumbong August-2011 September-2011
58 Waste Incinerator Plant Project Installation Waste Incinerator Plant Equipment PT. Fajar Surya Wisesa Tbk. December-2010 May-2011
59 Aspex Kumbong Sludge Incinerator Plant Project Demolition and Installation of Atap and Angle PT. Aspex Kumbong October-2006 October-2006
60 Aspex Kumbong Sludge Incinerator Plant Project Boiler Tubing Work PT. Aspex Kumbong February-2006 March-2006
61 Aspex Kumbong Sludge Incinerator Plant Project Mechanical Work PT. Kelsri E&C Management December-2005 March-2006
62 Aspex Kumbong Sludge Incinerator Plant Project Stack Work PT. Inkoprima Utamajaya December-2005 March-2006
63 Aspex Kumbong Sludge Incinerator Plant Project Steel Structure Work PT. Aspex Kumbong December-2005 March-2006
No. PROJECT TITLE WORK CLIENT PERIOD
01 RDMP RU-V Balikpapan Project Civil Work PKG-25 RDMP Balikpapan JO 21-September-2022 20-February-2023
02 Pertamina RU V Balikpapan TA Major Tahun 2021 Jasa Mechanical Activity Area HSC TA RU V Tahun 2021 PT. Pertamina (Persero) Tbk. 15-July-2022 23-September-2022
03 RDMP RU-V Balikpapan Project Civil Work PKG-23 RDMP Balikpapan JO 04-April-2022 20-September-2022
04 Pertamina RU VI Balongan TA Major Tahun 2022 Kontrak Utama Mekanikal Area POC Untuk TA Major Tahun 2022 Di RU VI Balongan PT. Pertamina (Persero) Tbk. 05-January-2022 16-May-2022
05 RDMP RU-V Balikpapan Project Mechanical Erection Work PKG-9 RDMP Balikpapan JO 25-May-2021 30-March-2023
06 RDMP RU-V Balikpapan Project Fire Proofing Work PKG-1 RDMP Balikpapan JO 03-May-2021 30-June-2023
07 Pertamina Dumai TA Project 2020 Mechanical Heat Exchanger, Vessel, Penyedia Alat Berat Dan Scaffolding Unit 110, 140 & 220 Area HOC TA 2020 PT. Pertamina (Persero) Tbk. August-2020 February-2021
08 Pertamina RU IV Cilacap TA Project 2019 TA Work (Replacement Construction Work Plate On The Roof and Shell Side of The Radiant Section Furnace 014F-101/102/103 & 84F-201 Area FOC-II TA 2019) PT. Pertamina (Persero) Tbk. July-2019 October-2019
09 Pertamina Dumai TA Project 2018 TA Work (Mechanical Heat Exchanger & Vessel Unit 211 & 701 Plant Stop 2018) PT. Pertamina (Persero) Tbk. September-2018 December-2018
10 Pertamina Dumai TA Project 2017 TA Work (Mechanical Heat Exchanger, Vessel, Provision Heavy Equipment and Scaffolding Unit 212 & 701 Area HCC Plant Stop 2017) PT. Pertamina (Persero) Tbk. May-2017 August-2017
11 Pertamina Dumai TA Project 2015 TA Work (Mechanical Heat Exchanger, Vessel, Penyediaan Alat Berat Dan Scaffolding Unit 211, 410, 840 & 920, Area HCC Turn Around 2015) PT. Pertamina (Persero) Tbk. October-2015 March-2016
12 Maintenance LBO Plant Project HCU 211 Heater Improvement Work PT. Patra SK September-2015 February-2016
13 Maintenance LBO Plant Project 211 H1 Heater and Reactor V-3 Recovery PT. Patra SK February-2014 March-2014
14 Maintenance LBO Plant Project YU-Base 4++ New Pipeline Installation Project PT. Patra SK January-2014 July-2014
15 Cilacap RFCC Project SMP Work GS E&C Corp. February-2013 May-2015
16 Cilacap RFCC Project Civil Work GS E&C Corp. November-2012 May-2015
17 Maintenance Project Pigging System Improvement Plant Area I PT. Vopak Terminal Merak October-2012 December-2012
18 Maintenance Project Fire Fighting System Modification PT. Vopak Terminal Merak October-2012 December-2012
19 Maintenance Project Replacement Pipe Line VCM PT. Vopak Terminal Merak October-2012 December-2012
20 Maintenance Project Replacement Pipe Support PT. Vopak Terminal Merak October-2012 December-2012
21 Maintenance LBO Plant Project VDU Heater Improvement Work PT. Patra SK May-2012 June-2012
22 1500 MT LPG Spherical Tank Project Supply Platform & Water Spray Line Daewoong CT Co., Ltd November-2011 January-2012
23 1500 MT LPG Spherical Tank Project Construction of 1500 MT Spherical Tank Daewoong CT Co., Ltd September-2011 October-2012
24 SK L Project Dismantlement & Erection Work of Revamp Internals SK E&C July-2007 December-2007
25 SK L Project Piping Work PT. Inwha Indonesia July-2007 March-2008
26 Gresik LPG 40MM SCFD Extraction Project Supply Vessel, Heat Exchanger, Tank, Filter, Column, Orifice Metering System CKC Incorporated June-2007 December-2007
27 SK L Project Equipment and Piping Work for OBL & Revamp Area PT. Indo Tehnik Industri June-2007 April-2008
28 Gresik LPG 40MM SCFD Extraction Project 2 Unit LPG Spherical Tank Erection Work PT. Media Karya Sentosa May-2007 January-2008
29 Gresik LPG 40MM SCFD Extraction Project Construction Work PT. Media Karya Sentosa May-2007 March-2008
30 Gresik LPG 40MM SCFD Extraction Project Construction Work SPE Co.,Ltd May-2007 March-2008
31 SK L Project Erection Work of Heater and APH System SK E&C March-2007 December-2007
32 CNOOC Ses Gas Project PWHT Work Shengli Engineering & Consulting Co.,Ltd March-2006 March-2006
33 CNOOC Ses Gas Project M/E/I/P Work for Gas Metering Station and C/P Work for Pabelokan Island PT. Supasi Widya Engineering October-2005 February-2006
34 ASC-6 VCM Plant Project Additional Facility Erection Work Hyundai Engineering September-2016 December-2016
35 Malaysia TE-3 Project Piling Work Lotte Chemical Titan Sdn.Bhd. March-2016 June-2016
36 ASC-6 VCM Plant Project Additional Piping Work At Pvc-4 Plant PT. Asahimas Chemical January-2016 January-2016
37 ASC-6 VCM Plant Project Chemical Cleaning Work Lotte E&C November-2015 December-2015
38 ASC-6 VCM Plant Project Piping Work PT. Asahimas Chemical September-2015 February-2016
39 ASC-6 VCM Plant Project Fire Proofing Work Lotte E&C September-2015 March-2016
40 ASC-6 VCM Plant Project Steel Structure, Mechanical, Piping, Painting, Insulation, F/F Work Lotte E&C December-2014 March-2016
41 ASC-6 VCM Plant Project Civil Work Lotte E&C May-2014 March-2016
42 Expansion Of Pomalaa Ferronickel Plant Project EPC for Oxygen Plant No.5 PT. Antam (Persero) Tbk. December-2013 June-2015
No. PROJECT TITLE WORK CLIENT PERIOD
01 MOH 2022 Maintenance Work of Boiler & Turbine Area PT. Cirebon Power Service 15-May-2022 30-June-2022
02 Jawa 9&10 CFSPP Project ESP & FGD Erection Work PT. Doosan Heavy Industries Indonesia 15-January-2022 15-February-2025
03 Jawa 9&10 CFSPP Project Boiler Erection Work PT. Doosan Heavy Industries Indonesia 25-May-2021 15-February-2025
04 Jawa 1 CCPP Civil Works At WTP And WWTP Area Samsung C&T 12-December-2019 07-October-2020
05 Jawa 1 CCPP Mechanical Erection Work (HRSG) Samsung C&T 05-December-2019 30-April-2022
06 PLTGU Tambak Lorok 600-850 MW Project Civil Zone 1, Zone 2 and Zone 3 PT. Hutama Karya (Persero) Tbk. March-2019 September-2021
07 Cirebon 2 1000MW CFPP Project Boiler Civil Work Hyundai E&C 09-November-2018 09-February-2022
08 Cirebon 2 1000MW CFPP Project Steam Turbine FDN & Building Work Hyundai E&C 09-November-2018 09-February-2022
09 Cirebon 2 1000MW CFPP Project Boiler Mechanical Work Hyundai E&C 09-November-2018 09-February-2022
10 Cirebon 2 1000MW CFPP Project Temporary Ash Pond Temporary Ash & Gypsum Storage Facility Hyundai E&C 09-November-2018 09-February-2022
11 Cirebon 2 1000MW CFPP Project Escalation Hyundai E&C 09-November-2018 09-February-2022
12 Cirebon 2 1000MW CFPP Project Joint Operation Fee Hyundai E&C 09-November-2018 09-February-2022
13 Cirebon 2 1000MW CFPP Project Erection Cost for Increased Boiler Quantities Hyundai E&C 09-November-2018 09-February-2022
14 Cirebon 2 1000MW CFPP Project Erection of Boiler Heavy Girder Hyundai E&C 09-November-2018 09-February-2022
15 Cirebon 2 1000MW CFPP Project Heavy Equipment Supply Hyundai E&C 09-November-2018 09-February-2022
16 Cirebon 2 1000MW CFPP Project Boiler Coal Bunker and Air and Gas Duct Fabrication Hyundai E&C 09-November-2018 09-February-2022
17 Cirebon 2 1000MW CFPP Project Sheet Pile Work Hyundai E&C 09-November-2018 09-February-2022
18 PLTGU Tambak Lorok 600-850 MW Project Reinforced Concrete Pressure Pipe (RCPP) Installation Work PT. Hutama Karya (Persero) Tbk. November-2018 October-2020
19 Outage 2016 Unit #1 Expansion Joint for Condenser PT. TJB Power Services March-2018 May-2018
20 Outage 2016 Unit #1 Installation Condenser Expansion Joint PT. TJB Power Services March-2018 July-2018
21 Tolo Wind Farm Project - Electrical & Instrument Work
- Civil Work
PT. PP (Persero) Tbk. 29-November-2017 30-May-2018
22 Erector Add-On Grati Block-2 Power Plant Project Mechanical Work PT. PP (Persero) Tbk. 27-November-2017 20-December-2019
23 Installation Of Circulating Water Pipe (RCCP Pipe) Project Grati Add On Block-2 150 MW Civil Work PT. PP (Persero) Tbk. 21-August-2017 22-January-2018
24 Kalsel-1 CFPP Project Steel Structure Work PT. Hans Jaya Utama July-2017 December-2017
25 Cirebon 2 1000MW CFPP Project Temporary Facility Work Hyundai E&C April-2017 September-2017
26 Sarulla Geothermal Power Plant Project Pipe Support Fab. & Delivery Work Hyundai E&C January-2017 April-2017
27 RCCP Installation Works Civil Work, Cooling Water RCCP Installation Work Grati Ccpp (Peaker) Extension Project 450Mw Consortium January-2017 December-2017
28 Cirebon 660MW CFPP Project MMP Work PT. CPS December-2016 January-2017
29 Cirebon 660MW CFPP Project BFP & Heater Replacement Work PT. Doosan Heavy Industries December-2016 January-2017
30 Temporary Facilities Of Cirebon2 1X1000MW CFPP Site Preparation of Site office Facilities Area PT. Hans Jaya Utama December-2016 January-2017
31 Sarulla Geothermal Power Plant Project Nil Area Temporary Facility & Piping Work Hyundai E&C November-2016 September-2017
32 Outage 2016 Unit #1 FD Fan 1 A Rotor Replacement PT. TJB Power Services June-2016 August-2016
33 Outage 2016 Unit #1 Installation Condenser Expantion Joint (Dogbone) PT. TJB Power Services June-2016 August-2016
34 Sarulla Geothermal Power Plant Project Sil Area Civil & Mehcanical Work Hyundai E&C February-2016 December-2016
35 Posco Power Indonesia Project Install for Equipment & Electrical for Water Treatment System PT. BHI Indonesia November-2012 January-2013
36 100MW X 2 Unit Aggregate Off-Gas Generation Power Plant Project Mechanical 2 (Turbine Generator) Erection Work PT. Seohee Indonesia June-2012 February-2014
37 100MW X 2 Unit Aggregate Off-Gas Generation Power Plant Project Mechanical 1 (Boiler) Erection Work PT. Seohee Indonesia April-2012 February-2014
38 100MW X 2 Unit Aggregate Off-Gas Generation Power Plant Project TG & Others Reinforced Concrete Work PT. Seohee Indonesia February-2012 May-2013
39 100MW X 2 Unit Aggregate Off-Gas Generation Power Plant Project Boiler Reinforced Concrete Works PT. Seohee Indonesia November-2011 April-2012
40 Cirebon 660MW CFPP Project Site Repair for Welding Defect of ST/RE PT. Doosan Heavy Industries February-2011 February-2011
41 Cirebon 660MW CFPP Project TBN & GEN. and Mechanical Work PT. Doosan Heavy Industries July-2009 April-2012
42 Cirebon 660MW CFPP Project EP, Coal & Ash Handling System Work PT. Doosan Heavy Industries July-2009 April-2012
43 Cirebon 660MW CFPP Project Temporary Security Facility and Fence Works PT. Doosan Heavy Industries July-2009 April-2012
44 Cirebon 660MW CFPP Project Turbin Block FDN Work PT. Doosan Heavy Industries July-2009 December-2009
45 Cirebon 660MW CFPP Project TBN Steel Structure Erection Work PT. Doosan Heavy Industries July-2009 June-2010
46 Cirebon 660MW CFPP Project Boiler Erection Work PT. Doosan Heavy Industries July-2009 April-2012
47 Cirebon 660MW CFPP Project Temporary Office & Facility PT. Doosan Heavy Industries June-2008 August-2008